|
Austroads Publications Online
|
Project Evaluation
AGPE
Guide to Project Evaluation — SET
Receive a 20% discount when all parts of the Guide are purchased as a set.
The Guide to Project Evaluation Set comprises of:
Part 1: Introduction to Project Evaluation
Part 2: Project Evaluation Methodology
Part 3: Models and Procedures
Part 4: Project Evalu...
|
AGPE01-09
Guide to Project Evaluation Part 1: Introduction to Project Evaluation
Part 1 of the Guide to Project Evaluation provides the context in which project evaluation is carried out. It provides an introduction to project evaluation and anticipates a link-point with the wider area of road transport planning, a very complex and demanding area that sets the appropriate ...
|
AGPE02-12
Guide to Project Evaluation Part 2: Project Evaluation Methodology
Part 2, Edition 2 includes the insertion of Commentary F – Documentation and Quality Control of
Benefit-Cost Analysis, and Commentary G Small Travel Times Savings, along with additional
references.
Part 2 provides guidelines for conducting benefit–cost analysis (BCA) and m...
|
AGPE03-05
Guide to Project Evaluation Part 3: Models and Procedures
Part 3 presents a summary account of the Austroads publications and other related sources of information that describe the wide range of tools used in project evaluation. In Part 3 a distinction is drawn between rural project evaluation procedures and urban (network) procedures, given that differ...
|
AGPE04-12
Guide to Project Evaluation Part 4: Project Evaluation Data
This Guide contains estimates of road user unit costs for use in Australia, calculated as at 30 June 2010. The unit costs are presented in a format suitable for use with most road project evaluation models, techniques, and software used by Australian road agencies and their consultants. E...
|
AGPE05-05
Guide to Project Evaluation Part 5: Impact on National and Regional Economies
Part 5 provides a guide to the conditions under which the use of macro-economic models in project evaluation is appropriate and how they can be applied. Major transport infrastructure projects often significantly alter the economies of regions in which they are located and, if large enough, the n...
|
AGPE06-05
Guide to Project Evaluation Part 6: Distributional (Equity) Effects
Part 6 helps the practitioner to evaluate the distributional (equity) impacts of transport projects, i.e. the winners and losers of projects, and how these impacts can be traded with efficiency gains. The procedures/processes provided help the decision-maker to consider distributional effects of ...
|
AGPE07-05
Guide to Project Evaluation Part 7: Post-completion Evaluation
Part 7 provides guidelines for carrying out evaluation of completed transport projects to assess actual performance against stated objectives. A post-completion evaluation is the final step in project evaluation, and provides feedback on evaluation methodologies, efficiency of implementation and ...
|
AGPE08-06
Guide to Project Evaluation Part 8: Examples
Part 8 of the Guide to Project Evaluation (the Guide) presents worked examples demonstrating
appropriate use of project evaluation techniques applied to a selection of infrastructure upgrading
projects commonly faced by practitioners. Some of these examples are updated and expanded
from the Austr...
|
This website is operated by CanPrint Communications on behalf of Austroads. If you have any questions, please use the feedback form or call us on 1300 889 873, between 8:00 am and 5:00 pm AEST. If you are outside Australia please call us on +61 2 6293 8381.
|