Austroads Publications Online


Austroads LTPP/LTPPM Study - Summary Report 2016–17

Log in or Register to Download free PDF

Publication no: AP-T332-18 Pages: 36
Published: 14 March 2018


The report provides a summary of works undertaken during the period 2016–17 for the Austroads project AT1064 – Long-term pavement performance (LTPP).

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the structural and functional performance of in-service pavement test sites across Australia.

The report also presents a summary of the LTPP/LTPPM current conditions and historical performance trends over the entire monitoring period and a brief summary of results of a survey on future directions of the project.


Table of Contents

Summary
1. Introduction
  • 1.1 Background
2. Scope of Work for 2016–17
3. Summary of Activities Undertaken in 2016–17
  • 3.1 Project Steering Group (PSG) Meeting
  • 3.2 LTPP and LTPPM Sites
  • 3.2.1 Monitoring
  • 3.2.2 Performance Trends
  • 3.2.3 Site Maintenance
  • 3.3 Future Directions Paper
  • 3.4 Project Dissemination and Technology Transfer
4. Work Plan for 2017–18
5. Project Outcomes for 2016–17
References
Appendix A Performance Trends – LTPP Sites
Appendix B Performance Trends – LTPPM Sites

This website is operated by CanPrint Communications on behalf of Austroads. If you have any questions, please use the feedback form or call us on 1300 889 873, between 8:00 am and 5:00 pm AEST. If you are outside Australia please call us on +61 2 6293 8381.

Terms of Use